Repetitive Manufacturing: Changes to Backflush Function ( RELNPP_REM_30E_KALK )
RFUMSV00 - Advance Return for Tax on Sales/Purchases BAL Application Log DocumentationThis documentation is copyright by SAP AG.
Short text
Repetitive Manufacturing: Changes to Backflush Function
Description
Calculation per production version
Up until now, it was only possible to backflush standard activities according to the standard cost estimate. This meant that during the backflush, the system always used the routing entered in the standard cost estimate (only one standard cost estimate is possible per period). In certain circumstances, this could lead to considerable variances between planned and actual costs.
It is now possible to create a standard cost estimate for each production version. This is controlled by the repetitive manufacturing profile. Here, you use the control parameters to control:
- whether the activities are to be backflushed according to the cost estimate of the particular production version, or
- whether the activities - as up to now - are to be backflushed according to the standard cost estimate
If you have set the first instance, the system will ask you whether a cost estimate is to be created for the production version when creating a run schedule header. When changing a run schedule header, you must trigger the creation of a cost estimate by selecting, Edit -> Cost estimate.
In this context, another function also exists that you can use to collectively create cost estimates for production vesions. This function is also used to update already existing cost estimates as changes to the routings are not automatically updated in the cost estimates. You can also use this function in KANBAN production procedures.
The CO transactions you use to automatically create or change cost collectors are also adjusted. This
means that a function has been introduced that you can use to trigger the creation of cost estimates. These transactions can also be used in repetitive manufacturing as well as in KANBAN production procedures.
Default values for cost object controlling
The default values for cost object controlling were enhanced by the costing variant for the planned costs.
Damage caused to data by errors
Software/hardware requirements
Installation information
Effects on System Administration
Effects on Customizing
You make these settings in the Implementation Guide.
Cost estimage per production version
Function in Customizing for repetitive manufacturing
Proceed
Function in Customizing for Controlling
Proceed
Costing variant for planned costs
Function in Customizing for repetitive manufacturing
Proceed
Function in Customizing for Controlling
Proceed
Effect on batch input
Changes to the Interface
Changes in procedure
Procedure for removing dataset errors
Dependent functions
Planning
Further notes
BAL Application Log Documentation RFUMSV00 - Advance Return for Tax on Sales/Purchases
This documentation is copyright by SAP AG.
Length: 3607 Date: 20240523 Time: 051456 sap01-206 ( 57 ms )