Ansicht
Dokumentation
Structure Changes in the Project System IMG (EA-APPL 110) ( RELNPS-470-IMGSTRUC )
Addresses (Business Address Services) ABAP Short ReferenceThis documentation is copyright by SAP AG.
Short text
Structure Changes in the Project System IMG (EA-APPL 110)
Use
As of SAP R/3 Enterprise PLM Extension 1.10 (EA-APPL 110) there are the following changes to the Project System Implementation Guide:
- Under Project System --> Claim --> Settings for Claims the following nodes were added:
- Controlling Scenario for Claims
- Assignment of Controlling Scenario for Notification Type
- Business Add-In: Customer-Specific Check Before Creating Cost Collector
- Unter Project System --> Progress as well as Materials Management --> Purchasing --> Purchase Order the node Progress Tracking was created with the following subnodes:
- Define Standard Events
- Define Event Scenarios
- Maintain Relationships Between Events in a Sceanrio
- Assignment of Default Scenario for Material Group
- Maintain Priorities for an Event
- Define Progress Tracking Profile
- Define Status Info Types
- Number Range Status Information
- Customer-Specific Evaluations
- Under Project System --> Material the following nodes were added:
- Project-Oriented Procurement (ProMan) with the subnodes Define Profile und Define Exceptions
- Interface for Procurement Using Catalogs (OCI)
Effects on Existing Data
Effects on Data Transfer
Effects on System Administration
Effects on Customizing
Further Information
TXBHW - Original Tax Base Amount in Local Currency CPI1466 during Backup
This documentation is copyright by SAP AG.
Length: 3149 Date: 20240523 Time: 082821 sap01-206 ( 30 ms )