Ansicht
Dokumentation

Structure Changes in the Project System IMG (EA-APPL 110) ( RELNPS-470-IMGSTRUC )

Structure Changes in the Project System IMG (EA-APPL 110) ( RELNPS-470-IMGSTRUC )

Addresses (Business Address Services)   ABAP Short Reference  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Structure Changes in the Project System IMG (EA-APPL 110)

Use

As of SAP R/3 Enterprise PLM Extension 1.10 (EA-APPL 110) there are the following changes to the Project System Implementation Guide:

  • Under Project System --> Claim --> Settings for Claims the following nodes were added:
  • Controlling Scenario for Claims

  • Assignment of Controlling Scenario for Notification Type

  • Business Add-In: Customer-Specific Check Before Creating Cost Collector

  • Unter Project System --> Progress as well as Materials Management --> Purchasing --> Purchase Order the node Progress Tracking was created with the following subnodes:
  • Define Standard Events

  • Define Event Scenarios

  • Maintain Relationships Between Events in a Sceanrio

  • Assignment of Default Scenario for Material Group

  • Maintain Priorities for an Event

  • Define Progress Tracking Profile

  • Define Status Info Types

  • Number Range Status Information

  • Customer-Specific Evaluations

  • Under Project System --> Material the following nodes were added:
  • Project-Oriented Procurement (ProMan) with the subnodes Define Profile und Define Exceptions

  • Interface for Procurement Using Catalogs (OCI)

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information






TXBHW - Original Tax Base Amount in Local Currency   CPI1466 during Backup  
This documentation is copyright by SAP AG.

Length: 3149 Date: 20240523 Time: 082821     sap01-206 ( 30 ms )