Ansicht
Dokumentation

Assigning Controlling Areas to FM Areas (deleted) ( RELNPSM_20_KOKRS_FIKRS )

Assigning Controlling Areas to FM Areas (deleted) ( RELNPSM_20_KOKRS_FIKRS )

ROGBILLS - Synchronize billing plans   BAL_S_LOG - Application Log: Log header data  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Assigning Controlling Areas to FM Areas (deleted)

Use

From SAP R/3 Enterprise Public Services 2.00 (EA-PS 200), it is no longer necessary to directly assign controlling areas to FM areas. The IMG activity Controlling Area - Assign FM Area was therefore deleted from the IMG of the enterprise structure.

The FM area is now determined using the company codes assigned to the controlling area - which is assigned to the FM area. The company code is determined from the CO objects.

Using this procedure, a company code relevant to controlling can be excluded from integration in Funds Management.

The prerequisite for this procedure if that the account assignment elements fund, functional area or grant are not activated in the IMG activity "Activate Account Assignment Elements".

The following are examples of the possible combinations:

  • A controlling area that is integrated in Funds Management by the assignment of FM area to company code can be assigned to another company code that is not assigned to a FM area.
  • Three company codes are assigned to the controlling area. Two of the company codes are assigned to different FM areas and one company code is not assigned to a FM area.
    In this combination, only the plan data for CO objects that belong to the company code assigned to this FM area are copied during plan data transfer in an assigned FM area.

If one of the account assignment elements is not activated, the assignment of controlling area to FM area must be unique, as before. All company codes assigned to the controlling area must either be assigned to the same FM area or this company code is not assigned to a FM area.

The assignment of controlling area to FM area must be unique even if you use the component Position Budgeting and Control (PA-PM-PB).

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information

You can find more information on integration with Position Budgeting and Control in SAP note 638183.






rdisp/max_wprun_time - Maximum work process run time   General Material Data  
This documentation is copyright by SAP AG.

Length: 2564 Date: 20240523 Time: 044025     sap01-206 ( 44 ms )