Scheduling in the Project System: Changes in 3.0 ( RELNPS_30_SCHEDULING )
ROGBILLS - Synchronize billing plans General Material DataThis documentation is copyright by SAP AG.
Short text
Scheduling in the Project System: Changes in 3.0
Description
In Release 3.0, the following changes were made to scheduling in Project System:
- Control key: Changes to indicators
- In Release 3.0, there are two different indicators in the control key for scheduling and determining capacity requirements for activities.
- Please refer to the release note Capacity Requirements Planning Indicator in the Control Key for more information.
- System status "Dates not current"
- If you make changes relevant to scheduling in a network, all WBS elements automatically get the status "Dates not current". Conversely, if you make changes to a WBS element which are relevant to scheduling, the network gets the status "Dates not current".
- Consideration of WBS element dates
- With Release 3.0, when an activity is assigned to a WBS element, the dates in that WBS element are used in scheduling the network containing that activity. WBS element dates are considered a constraint when scheduling activities assigned to WBS elements.