Ansicht
Dokumentation

English terminology changes in Release 3.0 of the Project System ( RELNPS_30_TERMÄNDERUNG )

English terminology changes in Release 3.0 of the Project System ( RELNPS_30_TERMÄNDERUNG )

BAL Application Log Documentation   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

English terminology changes in Release 3.0 of the Project System

Description

In Release 3.0 the following changes were made to English terminology:

  • Library network was changed to standard network to be consistent with other objects that perform similar functions as references such as standard milestones, standard work breakdown structures etc.
  • Completion confirmation was shortened to confirmation to reflect the fact that confirmations can be made even if the activity has not finished or has not yet been "completed".
  • Open item has been changed to commitment based on feedback from our U.S. subsidiary.
  • Cost determination has been changed to cost calculation to be consistent with the functionality and terminology in the PP module.
  • Invoicing element has been changed to billing element to be consistent terminology in the SD module.
  • In the Project System menus, the menu heading Additional functions has been changed to Extras to be consistent with an overall change of menu headings throughout the R/3 System.





TXBHW - Original Tax Base Amount in Local Currency   Vendor Master (General Section)  
This documentation is copyright by SAP AG.

Length: 1656 Date: 20240604 Time: 002919     sap01-206 ( 31 ms )