Ansicht
Dokumentation

Materials in Networks: Changes ( RELNPS_31G_NETZPLAN )

Materials in Networks: Changes ( RELNPS_31G_NETZPLAN )

SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   TXBHW - Original Tax Base Amount in Local Currency  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Materials in Networks: Changes

Description

In Release 3.1G, the following function was added to networks:

  • Generate planned independent requirements for a network
When you allocate a material component to a network activity, you can decide whether planned independent requirements are to be generated for this component. You must have already maintained the following indicators in the MRP 2 view of the material master:
  • Strategy group: 70 planning at assembly level

  • Mixed MRP: 1 assembly planning

Planned independent requirements are calculated from the actual requirements in the network.





Fill RESBD Structure from EBP Component Structure   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.

Length: 955 Date: 20240523 Time: 075601     sap01-206 ( 17 ms )