Ansicht
Dokumentation

Scheduling in Purchase Orders (Changed) ( RELNSCM500_ICH_PO_SCHEDU )

Scheduling in Purchase Orders (Changed) ( RELNSCM500_ICH_PO_SCHEDU )

Fill RESBD Structure from EBP Component Structure   General Material Data  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Scheduling in Purchase Orders (Changed)

Use

As of SAP SCM 5.0, if a schedule line contains only the shipping date/time or only the delivery date/time, SAP ICH determines the missing date/time automatically using the validation check PO_SCHEDULE. To do so, SAP ICH uses the receiving calendar of the ship-to location, the transportation duration of the means of transport of the item, and the shipping calendar of the ship-from location. The validation check is relevant for purchase order collaboration and for SMI purchase orders, and is active in the standard system. The BAdI /SCA/SCHEDULE is available for modifying the scheduling logic.

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information






General Material Data   General Material Data  
This documentation is copyright by SAP AG.

Length: 998 Date: 20240603 Time: 180000     sap01-206 ( 41 ms )