Ansicht
Dokumentation
Scheduling in Purchase Orders (Changed) ( RELNSCM500_ICH_PO_SCHEDU )
Fill RESBD Structure from EBP Component Structure General Material DataThis documentation is copyright by SAP AG.
Short text
Scheduling in Purchase Orders (Changed)
Use
As of SAP SCM 5.0, if a schedule line contains only the shipping date/time or only the delivery date/time, SAP ICH determines the missing date/time automatically using the validation check PO_SCHEDULE. To do so, SAP ICH uses the receiving calendar of the ship-to location, the transportation duration of the means of transport of the item, and the shipping calendar of the ship-from location. The validation check is relevant for purchase order collaboration and for SMI purchase orders, and is active in the standard system. The BAdI /SCA/SCHEDULE is available for modifying the scheduling logic.
Effects on Existing Data
Effects on Data Transfer
Effects on System Administration
Effects on Customizing
Further Information
General Material Data General Material Data
This documentation is copyright by SAP AG.
Length: 998 Date: 20240603 Time: 180000 sap01-206 ( 41 ms )