Model Mix Planning/Sequencing (Enhanced)

Use

As of SAP Supply Chain Management (SAP SCM) 5.1, the following enhancements have been made to the model mix planning (MMP) and sequencing:

  • The planning run using the linear program (LP) has been enhanced to provide the customer with the flexibility to choose the required lines of the line network to be considered for path calculation. If the time measured for different paths of a complex line network with multiple groups of alternative lines is not much and does not change the planning results, then the customer has the flexibility to consider only the default paths involving the planning segment. This reduces the processing time.
In previous releases, the optimizer required all possible paths on the line network to consider the upper limit for delay in time.
  • Interactive sequencing has been enhanced so that you have the freedom to choose between whether to firm the order, in case of manual rescheduling of the orders, using drag and drop or not. The current situation is that the system firmed the order after each drag and drop. Hence a deallocated order, which has been rescheduled by drag and drop, is firmed and cannot be rescheduled in a new sequence optimization. Therefore flexible and switchable line-specific profiles for firming the orders during manual rescheduling are provided. You can specify this behavior using a line-specific profile.
To specify line-specific profiles, you can use the transaction /SAPAPO/SEQC11. To access this transaction on the SAP Easy Access screen, choose Advanced Planning and Optimization -> Production Planning -> Automated Production Planning and Optimization ->Model Mix Planning -> Sequencing: Line-Specific Profiles.

Effects on Existing Data

  • The BAdI /SAPAPO/SEQ_LP_01 has been enhanced. The method ELIMINATE_FLOOBJECTS has been created. It allows you to choose the required lines of the line network to be considered for path calculation.
  • The BAdI /SAPAPO/SEQ_MULTI_02 has been enhanced. The method ROUND_BT_UPDOWN has been created. It allows you to decide whether you want to round off the base rate used during the capacity calculation or not.

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information






General Data in Customer Master   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.

Length: 2984 Date: 20240603 Time: 051205     sap01-206 ( 57 ms )