Ansicht
Dokumentation

Integration of SCM and ERP 2 ( RELNSCM_603_SCM_GEN_02_M )

Integration of SCM and ERP 2 ( RELNSCM_603_SCM_GEN_02_M )

RFUMSV00 - Advance Return for Tax on Sales/Purchases   General Material Data  
This documentation is copyright by SAP AG.
SAP E-Book

Short text

Integration of SCM and ERP 2

Use

As of SAP ECC 6.0 Enhancement Package 3 and SAP SCM 5.1, the Integration of SCM and ERP 2 (SCM_GEN_02) business function is available. This business function, comprises new functions or enhancements in the following areas:

  • Shelf life
  • Subcontracting
  • Interchangeability
  • Consideration of Shelf Life Data
The following data is transferred between SAP ERP and SAP SCM:
  • Remaining shelf life data of purchase requisitions and purchase orders is transferred from SAP ERP to SAP SCM.

  • Remaining shelf life data of SNP stock transfers (with or without source location) is transferred from Supply Network Planning (SNP) to SAP ERP.

  • Minimum Remaining Shelf Life in Batch Determination from Stock Transport Order
The required minimum remaining shelf life from the stock transport order is taken into account in batch determination in the goods issue posting.
When recording a goods issue against a stock transport order, you can carry out a batch determination process. In this process, the system searches for batches with certain characteristic values, such as minimum shelf life or status, according to a search schema. You can predefine the search schema and the characteristic values according to which you want to search for the batches.
As of this release, the required minimum remaining shelf life and the planned delivery time from the stock transport order are taken into account in the batch determination process.
  • Minimum Remaining Shelf Life in Purchase Requisition and Purchase Order
You can display and change the minimum remaining shelf lifein the requisition and purchase order. The minimum remaining shelf life is adopted in the PO item when a purchase order is created from a requisition.
The minimum remaining shelf life in the purchase requisition can be populated from a source of supply (i.e. contract or info record), the material master, or with data from SAP SCM.
Previously, the minimum remaining shelf life in the purchase order was adopted from the following documents and master data in the following order: reference document, RFQ, contract, info record, material master record.
Now the system adopts the minimum remaining shelf life from the purchase requisition. If no minimum remaining shelf life has been defined in the requisition, it is determined from the aforementioned documents and master data.
Effects on Customizing
Furthermore, you can specify in Customizing for Purchasing via the field selection for the purchase requisition ( Define Screen Layout at Document Level) whether the field is to be shown or hidden and whether its contents can be changed in the Enjoy transactions.
If the minimum remaining shelf life differs from that in the assigned purchase requisition, you can have a message issued in the purchase order ( Define Attributes of System Messages).

The subcontracting process has been enhanced. You can now assign multiple production versions to a subcontracting purchase info record in SAP ERP. To do the assignment, in SAP ERP, choose Logistics-> Central Functions -> Supply Chain Planning Interface -> Core Interface Advanced Planner and Optimizer-> Environment-> Data Transfer → Assign Multiple Production Versions.

You can also define whether purchase info records, to which multiple production versions are assigned, are transferred from SAP ERP to SAP APO.

For more information, see the Implementation Guide (IMG) for SAP ERP under Integration with Other SAP Components-> Advanced Planning and Optimization -> Basic Settings for Data Transfer -> Change Transfer-> Change Transfer for Master Data -> Configure Change Transfer for Master Data.

You can also mark individual production versions as invalid in cases where a purchase info record has multiple production versions assigned to it. As part of the initial data transfer to SAP APO, SAP ERP transfers only those production versions that are valid. To mark production versions as invalid, you have two options:

  • You can manually define this by setting the Production Version Invalid indicator for the relevant production version.
To do so, in SAP ERP, choose Logistics -> Central Functions -> Supply Chain Planning Interface -> Core Interface Advanced Planner and Optimizer -> Environment -> Data Transfer -> Assign Multiple Production Versions.
You can use the report SET_PRODVER_VALIDITY to have the system automatically check whether production versions are valid in the background. You have two options when you use the check report:
  • Set not valid entries

If you choose this option, the invalid production versions are simply marked by the system and are not transferred to SAP APO as part of the initial data transfer. This is the default setting.
  • Delete not invalid entries

If you choose this option, the invalid production versions are automatically deleted by the system.

Previously in a subcontracting scenario, Supply Network Planning (SNP) and Capable-to-Match (CTM) could only consider one source of supply for each subcontracting location. The reason for this was that in SAP ERP, you could only assign one production version to a purchasing info record. You could then only convert this production version to one production process model (PPM via a PP/DS PPM) or one production data structure (PDS) when transferring data to SAP SCM.

As of SAP SCM 5.1, you can assign multiple production versions to a purchasing info record in SAP ERP. You make this assignment in the SAP ERP system using a new transaction: Logistics -> Central Functions -> Supply Chain Planning Interface -> Core Interface Advanced Planner and Optimizer -> Environment -> Data Transfer -> Assign Multiple Production Versions. After converting the production versions to PPMs or PDS, multiple sources of supply are available for each subcontracting location in the SCM system.

In interactive SNP planning, you can determine the sources of supply as follows:

o,,For an SNP stock transfer of type Subcontracting, you can choose an alternative source of supply from a proposal list in the planning table.

o,,You can change the source of supply for a planned order in the detail view.

SNP and CTM planning runs choose the sources of supply according to the rules for determining source of supply that are in place (for example, on the basis of procurement priority or cost).

Interchangeability Master Data can now be transferred from ERP system to SCM.

Effects on Existing Data

Effects on Data Transfer

Effects on System Administration

Effects on Customizing

Further Information






General Data in Customer Master   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 8302 Date: 20240520 Time: 212627     sap01-206 ( 148 ms )