Ansicht
Dokumentation

/ACCGO/ACM_RECONCILE058 - Contract &1: Reconciliation failed; refer to the long text for details - /ACCGO/ACM_RECONCILE 058

/ACCGO/ACM_RECONCILE058 - Contract &1: Reconciliation failed; refer to the long text for details - /ACCGO/ACM_RECONCILE 058

CPI1466 during Backup   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.
SAP E-Book

The system displayed this message because the reconciliation process for your contract failed.

To resolve this issue, ensure that the following requirements are satisfied before executing the reconciliation report:

  1. You have performed a MATREX execution of the material and plant combination. MATREX is a system transaction used to consolidate stock on hand records and create pricing keys for inventory records. This transaction is a prerequisite for creating records in the CMM_VLOGP_KONVD reporting table.
  2. You have ensured that the CPE Pricing and Master Data setup are completed.
  3. You have ensured that all conversion factors related to the following Unit of Measures (UoMs) have been properly maintained in transactions MM02(material master) and CUNI:
  • Physical Commodity UoM

  • Quotation/Term UoM

  • Mass UoM

  • Volume UoM

In case you're still experiencing issues in reconciling your contract, first ensure that all the requirements listed above have been satisfied. If the issue persists, try executing a revaluation of the contract using the transaction CMM_LREV.






RFUMSV00 - Advance Return for Tax on Sales/Purchases   Vendor Master (General Section)  
This documentation is copyright by SAP AG.

Length: 1484 Date: 20240426 Time: 172350     sap01-206 ( 21 ms )