Ansicht
Dokumentation

/CPD/SS_MESSAGES297 - Plan line type should be either U, D, or S; see the long text. - /CPD/SS_MESSAGES 297

/CPD/SS_MESSAGES297 - Plan line type should be either U, D, or S; see the long text. - /CPD/SS_MESSAGES 297

CPI1466 during Backup   ROGBILLS - Synchronize billing plans  
This documentation is copyright by SAP AG.
SAP E-Book

Diagnosis

At least one of the plan line types does not have an expected indicator. The expected indicators are:

  • S - Indicates a plan line item with a confirmed resource assignment
  • D - Indicates a plan line item without a confirmed resource assignment
  • U - Indicates a plan line item that stores the difference between confirmed and unconfirmed effort

System Response

Procedure

Procedure for System Administration






rdisp/max_wprun_time - Maximum work process run time   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 731 Date: 20240427 Time: 001846     sap01-206 ( 19 ms )