Ansicht
Dokumentation
/CPD/SS_MESSAGES297 - Plan line type should be either U, D, or S; see the long text. - /CPD/SS_MESSAGES 297
CPI1466 during Backup ROGBILLS - Synchronize billing plansThis documentation is copyright by SAP AG.
Diagnosis
At least one of the plan line types does not have an expected indicator. The expected indicators are:
- S - Indicates a plan line item with a confirmed resource assignment
- D - Indicates a plan line item without a confirmed resource assignment
- U - Indicates a plan line item that stores the difference between confirmed and unconfirmed effort
System Response
Procedure
Procedure for System Administration
rdisp/max_wprun_time - Maximum work process run time rdisp/max_wprun_time - Maximum work process run time
This documentation is copyright by SAP AG.
Length: 731 Date: 20240427 Time: 001846 sap01-206 ( 19 ms )