Ansicht
Dokumentation
/CWM/LES035 - Goods posting of delivery item &1 has already been started - /CWM/LES 035
ROGBILLS - Synchronize billing plans Fill RESBD Structure from EBP Component StructureThis documentation is copyright by SAP AG.
Diagnosis
The system has rejected the goods posting, because for at least one delivery item of a CW material the goods posting has already begun and is not yet finished.
System Response
For non-CW materials, the remaining quantities are determined and posted in the system.
The remaining quantity in parallel unit of measure is not determined for CW materials. You are advised to enter the remaining quantities to be posted for the delivery item concerned with the Goods Movement (transaction MIGO).
Procedure
The requested goods movement cannot be made until one of the following conditions is met:
- The goods movement of the delivery item specified has been finished (for instance, with transaction MIGO)
- The previous goods movements of the delivery item specified have been reversed
Procedure for System Administration
Vendor Master (General Section) CL_GUI_FRONTEND_SERVICES - Frontend Services
This documentation is copyright by SAP AG.
Length: 1087 Date: 20240426 Time: 135835 sap01-206 ( 24 ms )