Ansicht
Dokumentation
/AFS/SIMGPP_PRSZVLDY - Define Validity Periods for Distribution Profiles
CPI1466 during Backup ROGBILLS - Synchronize billing plansThis documentation is copyright by SAP AG.
You can create distribution profiles for the distribution of planned independent requirements. You can define them material-dependent or material-independent. During the presizing the distribution of the planned independent requirements is carried out according to this profile. For this you must enter a validity period. Beyond this period or if no distribution profile exists, the planned independent requirements are equally distributed.
Plant Validity period No. Date from Date to
0001 Christmas 1 01.11.2000 24.12.2000
0001 Christmas 2 01.11.2001 24.12.2001
0001 Christmas 3 01.11.2002 24.12.2002
To define different validity periods for distribution profiles, you have to maintain the following settings:
- Plant
- Validity period
- Number of time interval
- Date from
- Date to
You can use one or several time intervals at client or plant level. If you define the distribution for a material or profile at plant level, the time intervals for several plants can differ.
Specify a plant for which a certain distribution is relevant within a certain period. For this enter a validity period and assign a number. Enter a time interval.
You can maintain distribution profiles at plant, category, grid value and/or period level. You can use the four profiles simultaneously.
In the view AFS Basic data of the material master you assign material-independent distribution profiles to a material at client level. In the view AFS MRP you maintain the assignment at plant level.
RFUMSV00 - Advance Return for Tax on Sales/Purchases General Material Data
This documentation is copyright by SAP AG.
Length: 1902 Date: 20240523 Time: 221524 sap01-206 ( 41 ms )