Ansicht
Dokumentation
/CPD/VC_TRNS_STRTG - Make Settings for Transfer Strategies
TXBHW - Original Tax Base Amount in Local Currency rdisp/max_wprun_time - Maximum work process run timeThis documentation is copyright by SAP AG.
You use this Customizing activity to make the following settings for transfer strategies:
- Define transfer strategies
- Assign multiple transfer methods to a transfer strategy
- For example, the transfer strategy can include two transfer methods: one for the quantity update of the network activity and one for the cost update of the work breakdown structure.
- Define characteristic values for the transfer strategy by configuring combinations of characteristics from the planning cube
- The filtered characteristic values specified are updated in the corresponding SAP ERP system. For example, you can select Plan Currency and UoM (Unit of Measurement) as relevant for transfer to the SAP ERP system.
- Network activity quantities are updated in Project System (PS).
- Cost and revenue are updated in Controlling(CO) based on the settings in the Customizing activity Define Version Types
Vendor Master (General Section) Addresses (Business Address Services)
This documentation is copyright by SAP AG.
Length: 1356 Date: 20240523 Time: 185500 sap01-206 ( 24 ms )