Ansicht
Dokumentation

/FRE/FRP_012 - Maintain FRP Start Profiles

/FRE/FRP_012 - Maintain FRP Start Profiles

CPI1466 during Backup   CL_GUI_FRONTEND_SERVICES - Frontend Services  
This documentation is copyright by SAP AG.
SAP E-Book

The start profile defines at what time the F&R Processor or individual sequences of the F&R Processor start. The start and end time must be maintained within the defined range for the individual planning day in the process control profile.

If the Consumption Update Required field is flagged, the process is not started until the consumption data has been updated.

To unburden the time-critical period, you can assign different starting times to the sequences. The time-critical period begins with the import of current stock and consumption data and ends with the creation of order proposals, which happens at sequence 3. Sequences 1 and 2 can be started before the time-critical period, sequence 4 and 5 after the time-critical period. Do not change the correct order of the sequences as this would lead to erroneous results.

  • If you want all sequences for a location to be executed simultaneously, maintain the following fields in the location data of the FRP administration: Process Level= P, Start Profile.
  • If you want to assign different starting times to the sequences, set the Process Levelfield to Sand assign starting profiles to the sequences in the dispatcher profile.






ROGBILLS - Synchronize billing plans   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.

Length: 1643 Date: 20240523 Time: 221336     sap01-206 ( 38 ms )