/FRE/MD_015 - Define Scheduled Evaluation of Replenishment Parameters
CPI1466 during Backup General Material DataThis documentation is copyright by SAP AG.
It is possible to define the scheduled determination of planning parameters for the following specific location product attributes:
- Maximum stock level
- Minimum stock level
- Maximum target range of coverage
- Minimum target range of coverage
- Target stock level
For each attribute, one of the following key dates can be set as the determination date:
- Planning date
- Purchase order date
- Delivery date
- Availability date
If no determination date is defined for a location attribute, then this attribute is evaluated for a fixed date (the planning date).
Assume that as of today, the maximum stock level is determined for the planning date. You could, however, determine the maximum stock level for a different key date, such as the delivery date, for example.