Ansicht
Dokumentation
CPRO_STRUK_CP_PRFPLN - BAdI: Object Creation in Control Plan
CPI1466 during Backup CPI1466 during BackupThis documentation is copyright by SAP AG.
Use
This Business Add-In (BAdI) is used in the Project Management (PPM-PRO) component.
You implement this BAdI if you want to generate inspection plans or routings in SAP ERP from the control plan. To do this, you assign the source fields of a control plan version to the required target fields of one or more objects you want to generate (inspection plans, routings, and so on).
Requirements
Standard settings
- In the standard system, there is no activated BAdI implementation.
- The BAdI is filter-dependent.
- The BAdI is not designed for multiple use.
In the method CREATE_OBJECTS for class CL_DPR_CONTROL_PLAN_VERSION_O, the system calls two BAPIs. They return a table with error messages that could have been issued when the object was created.
Activities
For information about the implementation of BAdIs in the context of the Enhancement Concept, see SAP Library for SAP NetWeaver under BAdIs - Embedding in the Enhancement Framework.
Methods
Adjust Source/Target Fields of Routing
Adjust Source/Target Fields of Inspection Plan
Define Number of Inspection Plans
Messages/Objects in Table Form
Specify Type of Object Link to Be Created
Interfaces
BAdI Interface IF_EX_DPR_CONTROLPLAN
BAL Application Log Documentation CL_GUI_FRONTEND_SERVICES - Frontend Services
This documentation is copyright by SAP AG.
Length: 2931 Date: 20240523 Time: 161548 sap01-206 ( 93 ms )