Ansicht
Dokumentation

EHENV_RPT_PERIOD_VAL - BAdI: Env. Report Period Validation

EHENV_RPT_PERIOD_VAL - BAdI: Env. Report Period Validation

SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   General Material Data  
This documentation is copyright by SAP AG.
SAP E-Book

This Business Add-In (BAdI) is used in Environment Management (EHS-SUS-EM) to perform validation of start and end dates for the period of an environmental report.

This BAdI definition uses the IF_BADI_EHENV_RPT_PERIOD_VALinterface, which includes the IS_PERIOD_NOT_VALIDmethod. You can use this BAdI to implement the logic for determining whether the specified pair of start-end dates is not acceptable.

For more information about the standard settings (filters, single or multiple uses), see the Enhancement Spot Element Definitions tab in the BAdI Builder (transaction SE18).

The BAdI is of multiple use type (none, one, or multiple implementations are allowed to exist that match specific filter conditions). The BAdI uses a filter EHSFORMNAMEcorresponding to the code of the form that is used to create the report.






PERFORM Short Reference   General Data in Customer Master  
This documentation is copyright by SAP AG.

Length: 1320 Date: 20240523 Time: 173016     sap01-206 ( 38 ms )