Ansicht
Dokumentation

FINS_CFIN_MCE_IL - Initial Load of Material Cost Estimates

FINS_CFIN_MCE_IL - Initial Load of Material Cost Estimates

BAL Application Log Documentation   Addresses (Business Address Services)  
This documentation is copyright by SAP AG.
SAP E-Book

You can perform an initial load of material cost estimates to transfer material cost estimates from a source system to the Central Finance system, such as loading material cost estimates from periods prior to the start date of ongoing replication.

The initial load of material cost estimates is carried out using the SAP Landscape Transformation Replication Server (SLT).

The initial load has the same restriction and uses the same AIF interface as material cost estimate ongoing replication.

The material cost estimates to be transferred are validated against the transfer rules.

Caution: Please specify the data scope of initial load via transaction LTRS in the SLT system before carrying out the initial load. If not, all the relevant material cost estimates in the source system will be transferred in the initial load process.

Define the initial load object in SLT using the predefined initial load object CFI_KEKO_L. For the predefined SLT configuration for this initial load, see SAP Note 3062966.

After the initial load of material cost estimates has been started in SLT, the data is transferred from the source system to the Central Finance system and validated against the transfer rules. The final processing result is shown in SAP Application Interface Framework (AIF), under namespace /FINCF, interface CE_MAT.

For more information, see Configuration in SAP Landscape Transformation Replication Serveron the SAP Help Portal under Central Finance->Configuring Your Central Finance Scenario.






SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   ROGBILLS - Synchronize billing plans  
This documentation is copyright by SAP AG.

Length: 1854 Date: 20240607 Time: 052533     sap01-206 ( 44 ms )