Ansicht
Dokumentation

HR_LSO_M1C2D4E2A5 - Specify Activity Types

HR_LSO_M1C2D4E2A5 - Specify Activity Types

ROGBILLS - Synchronize billing plans   General Material Data  
This documentation is copyright by SAP AG.
SAP E-Book

In this step, you set up the activity types for internal activity allocation between the cost object of the course and the participants and instructors.

  • Under LEART you specify the activity type for participant activity allocation.
  • Under RLART you specify the activity type for instructor activity allocation.
  • You must also maintain the switch FLWAY used to determine the Billing/Allocation info unless you have already done so in the step for integration with Sales and Distribution.

The activity types must be already maintained in Cost Accounting.

You can also use the wizard for these configuration steps. The wizard guides you through the individual settings step-by-step.
If you use the wizard however, you must work through all of the integration settings for Cost Accounting.






rdisp/max_wprun_time - Maximum work process run time   Vendor Master (General Section)  
This documentation is copyright by SAP AG.

Length: 1006 Date: 20240523 Time: 214939     sap01-206 ( 22 ms )