Ansicht
Dokumentation

IAOM_BUSINESS_SCENAR - Business Add-In: Controlling Parameters

IAOM_BUSINESS_SCENAR - Business Add-In: Controlling Parameters

Vendor Master (General Section)   PERFORM Short Reference  
This documentation is copyright by SAP AG.
SAP E-Book

This Business Add-In (BAdI) is used in the Product Cost Controlling component (CO-PC).

You can use this BAdI to change selected controlling parameters.

In the standard delivery, the BAdI is not active.

The BAdI is dependent on a filter and is not designed for multiple use.

After you have called the IMG activity, proceed as follows:

  1. In the following dialog box, enter in the field "Implementation" a name for the BAdI implementation and choose Copy.
If implementations have already been created for the BAdI, a dialog box with the existing implementations will be displayed. In this dialog box, choose Create.
  1. In the corresponding field, enter a short text for implementation .
  2. In the tab Propertiesenter filter properties - if this is a filter-dependent BAdI.
  3. Choose the tab Interface.
The name of the implementing class is generated by the system based on the name of your impmlementation. You can change the name.
If the BAdI is a menu exit, the tab FCodes also appears.Enter a function here and, if necessary, additional data.
  1. Save your entries and assign a package.
  2. Position the cursor on a method. Call up the Class Builder by double-clicking it.
  3. Between the statements method <Interface-Name>~<Name of Method>. and endmethod, enter the coding you request for the implementation.
  4. Save and activate your coding, and navigate back to the screen Change Implementation.
  5. Save on the screen Change Implementation.
Note: You can first create an implementation for the BAdI and then activate this later on. In this case, close the processing function at this time.
  1. Choose Activate.
When the application program is executed, the coding you have created will be run.

To display default coding, choose Goto → Default Coding → Display.

Methods

Account Assignment to Profit Center/Profitability Segment Required?

Order Type for GeCCo (Internal Order)

Change Project Profile for Automatically Created PS Project

Change Business Scenario Group






Fill RESBD Structure from EBP Component Structure   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 3303 Date: 20240523 Time: 185823     sap01-206 ( 38 ms )