MB_EWM_DELIVERIES - BAdI: Determine Delivery Dates
rdisp/max_wprun_time - Maximum work process run time ROGBILLS - Synchronize billing plansThis documentation is copyright by SAP AG.
This Business Add-In (BAdI) is used in the MM-IM component. You can use this BAdI to determine the delivery date and the goods issue date of an EWM outbound delivery.
This BAdI is called during the creation of an outbound delivery via MB26 or MIGO with reference to a material reservation.
The BAdI allows you to modify the delivery date and planned goods movement date.
The following list contains all import and changing parameter structures with a short description of the available fields.
- IS_VM07M
- This parameter contains the material document data from table VM07M (posting data).
- IS_MSEG
- This parameter contains the material document data from table MSEG (material document items).
- CV_LFDAT
- Delivery Date
- CV_WADAT
- Planned Goods Movement Date
None
For more information about the standard settings (filters, single or multiple uses), see the Enhancement Spot Element Definitions tab in the BAdI Builder (transaction SE18).
As standard, no BAdI implementation is activated.
This BAdI is not for multiple use and is not filter dependent.
You can find example implementations in the BAdI Builder on the Enhancement Spot Element Definitions tab in the Implementation Example Classes section.
The following example implementations are available:
- EXM_IMP_MB_DELIVERY_CREATION
- Implementation: BAdI for EWM Delivery Creation
For information about the implementation of BAdIs in the context of the Enhancement Concept, see SAP Library for SAP NetWeaver under BAdIs - Embedding in the Enhancement Framework.
Fill RESBD Structure from EBP Component Structure General Data in Customer Master
This documentation is copyright by SAP AG.
Length: 2488 Date: 20240523 Time: 194634 sap01-206 ( 84 ms )