Ansicht
Dokumentation

OHADBAV030VA - Define Regulations for Calculation Control

OHADBAV030VA - Define Regulations for Calculation Control

BAL Application Log Documentation   CPI1466 during Backup  
This documentation is copyright by SAP AG.
SAP E-Book

You can use this Customizing activity to specify the rules for controlling the calculation of the pension equalization payment.

Using these rules, the Pension Equalization Payment: Distribution Proposal Determination (RPCAVVD0) report carries out the net present value calculation by calling the Pension Determination (RPCWPCD0) report.

To specify rules for calculation controlling, proceed as follows:

  1. Start the activity, enter a four-character ID in the dialog box’s entry field, in line with your specifications, and confirm you entry.
  2. Assign a designation to your rules’ four-character ID.
  3. Fill the VA: Calculation Control forPension Equalization Payment table as per your specifications.
    The following entry fields are available for each entry line:
    1. To age
      The rules are valid until this age. You can specify an age directly in this entry field.
    2. Fct. age (function age)
      The rules are valid until this age. In this entry field, you can specify a customer-defined function ID that is used to determine the age.
    3. Valid fromValid to
      Enter the validity interval in these entry fields.
    4. VT ER (Processing type: own pension)
      In this entry field, enter the processing type for calculating the own pension for calculating the legal rights to future pension payments.
    5. VT HR (Processing type: surviving dependent’s pension)
      In this entry field, enter the processing type for calculating the surviving dependent's pension for calculating the legal rights to future pension payments.
    6. Key date
      In this entry field, you can specify a function ID that is used to calculate the key date.
  4. Choose Save.
Note:
For more information, see the F1 help for the individual entry fields.






SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 2489 Date: 20240523 Time: 234157     sap01-206 ( 36 ms )