Ansicht
Dokumentation

OHADBAV830 - Adjustment Date and Period

OHADBAV830 - Adjustment Date and Period

Vendor Master (General Section)   General Data in Customer Master  
This documentation is copyright by SAP AG.
SAP E-Book

In this workstep, you specify the basic calculations that lead to the calculation of the pension adjustment date.

You also define the calculation formula (function for specifying the adjustment date).

The RP_01C_DI_DATE_OF_INCREASE function ('D1') for calculating the adjustment date is delivered in the standard system.

  1. Determine the function for calculating the adjustment date.
    Hereafter, it is assumed that you use the standard module.
  2. If necessary, you can define a general rule for calculating the date of the first adjustment. This general rule can be overridden by each individual. To do this, you can enter a date type. If this data type exists in infotype 0041 (Date Specifications) for the relevant personnel number, the date is taken from the infotype.
  3. To set the date of the next adjustment, you can either use a symbolic constant or enter a fixed value with the time unit of months.

By assigning a variable key, you can enter different adjustment periods for individual pension components within one pension plan. The variable key is used with the return value of feature DWCWR to determine the valid table entry.






SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   BAL_S_LOG - Application Log: Log header data  
This documentation is copyright by SAP AG.

Length: 1423 Date: 20240523 Time: 230351     sap01-206 ( 31 ms )