Ansicht
Dokumentation

RDSVV_CHRO_SYDAT - Define Tolerance Periods - Chronological Document Numbering (SD&FI)

RDSVV_CHRO_SYDAT - Define Tolerance Periods - Chronological Document Numbering (SD&FI)

BAL_S_LOG - Application Log: Log header data   Vendor Master (General Section)  
This documentation is copyright by SAP AG.
SAP E-Book

Use

This customizing view (RDSVV_CHRO_SYDAT) enables additional validation/definition of allowable posting dates or document dates.

This is in addition to the existingmandatory chronological numbering framework within both FI and SD modules.

You can use this view to:

  • Define that there is no deviation from the system date permissible for posting or document dates
  • Define a given tolerance beforeor afterthe system date for posting or document dates.

For example:

Defining 0 days before system date and 0 days after system date ensures that posting dates or document dates must be the current system date.

Defining 2 days before system date and 1 day after system date ensures that posting dates or document dates are permissible in this defined "tolerance" period of 3 days.

NOTE:

  • Changing or deleting entries in this customizing does not affect the background chronological numbering controls, with the basic chronological numbering rule always applying.
  • This additional and optional validation is provided so you can simply control the length of the time window within which you set the document posting/document date. We recommend your settings here reflect current government guidelines and your organizations internal business processes.

CAUTION:

You can set any combination of before and after system dates in this view. However, each tolerance period you define in this view MUSTrespect the existing chronological numbering rule framework.

Use this customizing activity to specify defined allowable deviations from the system date for posting dates or document dates - for documents that require a digital signature.

CAUTION:

The Angola Tax Authorities require that you do notpost after or before the current date. Therefore, SAP recommends that you set the deviation value 0.






Vendor Master (General Section)   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 2254 Date: 20240523 Time: 214933     sap01-206 ( 40 ms )