Ansicht
Dokumentation

RMX_0015 - Assign Process Parameter Class to Process Instruction Category

RMX_0015 - Assign Process Parameter Class to Process Instruction Category

ROGBILLS - Synchronize billing plans   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.
SAP E-Book

In this IMG activity, you define how the system is to transfer the process parameters from the recipe in Recipe Management (PLM-RM) to process instructions in Production Planning for Process Industries (PP-PI).

  • In Customizing for PP-PI, you have defined the process instructions and provided an initial value for all the characteristics to which values are to be assigned during the recipe transformation.
  1. For each control recipe destination, specify the class for the process parameter result that you use in Trial Management and to which you want to transfer the results. If necessary, specify the process message and process instruction categories.
  2. For those characteristics that you want to fill from PP-PI, specify a parameter and, if necessary, the characteristic (value assignment) from Recipe Management from which the system reads the value.

Note:

The settings are plant-dependent.





CPI1466 during Backup   CPI1466 during Backup  
This documentation is copyright by SAP AG.

Length: 1643 Date: 20240523 Time: 204627     sap01-206 ( 34 ms )