Ansicht
Dokumentation

RMX_0028 - Define Status of Inspection Plans Copied with Stability Study Building Blck

RMX_0028 - Define Status of Inspection Plans Copied with Stability Study Building Blck

CPI1466 during Backup   ABAP Short Reference  
This documentation is copyright by SAP AG.
SAP E-Book

In this IMG activity, you define the status for inspection plans that were copied with the stability study building block.

When a stability study building block is copied, the inspection plans are also copied. In order to distinguish copied inspection plans from inspection plans that were created manually, you can use a different status for copied inspection plans.

Note that these settings are dependent on a plant.

Plant Status
1000 74






ABAP Short Reference   ROGBILLS - Synchronize billing plans  
This documentation is copyright by SAP AG.

Length: 749 Date: 20240523 Time: 204835     sap01-206 ( 22 ms )