Ansicht
Dokumentation

SIMG_CFMENUOHP5ZOPT - Determine Assignment Options

SIMG_CFMENUOHP5ZOPT - Determine Assignment Options

Addresses (Business Address Services)   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.
SAP E-Book

In this step, you specify which assignment options are set up in the Assignment Options: Change dialog box in the assignment assistant for manually assigning employees to requirements.

You can choose from the following options in the dialog box:

  • Adjust working time to requirement
  • by moving the working time

  • by extending the working time (specifying an attendance type)

  • Do not split up requirements interval
  • Do not split up working time

In the Can be changed checkbox, you can determine whether the settings are default values or standard values.

  • Can be changed is selected
    The settings are default values that can be changed by the user. The input fields in the Assignment Options: Change dialog box are ready for input.
  • Can be changed is not selected
    The settings are standard values that cannot be changed by the user. The input fields in the Assignment Options: Change dialog box are not ready for input.

In the Can be saved checkbox, you can determine whether or not the settings changed by the user can be saved.

  • Can be saved is selected
    Users can save the changed assignment options. They can get the saved settings by calling up the Assignment Options: Change dialog box again.
  • Can be saved is not selected
    Users cannot save the changed assignment options. If they call up the Assignment Options: Change dialog box again, they get the standard settings.

When assigning an employee to a requirement, you want to be able to adjust the employee's working time to suit the requirements interval.
You want make the adjustment by changing the working time.
You do not want the working time or the requirements interval to be split up.
You want it to be possible to change and save the settings.

  • You select the Adjust working time to requirement (ADOPT) option.
  • You select the By changing working time option.
  • You select the Can be changed and Can be saved options.

Result
These settings are the default assignment options in the Assignment Options: Change dialog box. They can be changed and saved.

The following options for Breaking down requirements assignment can be selected:

  • Adjust using a substitution (ADOPTSUB)
  • Do not split up requirements interval (SPLIT1)
  • Do not split up working time (SPLIT2)

All options can be changed and saved.

  • In the Value abbr. field for the required assignment option, enter X to activate these settings.
  • Use the Can be changed and Can be saved checkboxes to specify whether your settings are default or standard settings.






General Material Data   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.

Length: 3896 Date: 20240524 Time: 003706     sap01-206 ( 43 ms )