Ansicht
Dokumentation

SIMG_CFMENUOHP600 - Configure Time Evaluation in Target Planning

SIMG_CFMENUOHP600 - Configure Time Evaluation in Target Planning

rdisp/max_wprun_time - Maximum work process run time   PERFORM Short Reference  
This documentation is copyright by SAP AG.
SAP E-Book

You can use this IMG activity to minimize runtimes for time evaluation from target planning.

You do this in the time evaluation schema by omitting individual process steps from evaluation that you do not need to make time accounts in the target plan. When the target plan is finished, these process steps are run so that the complete time evaluation results are available in cluster B2.

You have implemented Time Evaluation to suit the requirements of Shift Planning.

  1. In your time evaluation schema for target planning, check which process steps you do not directly require to get the desired results and are not essential for a successful time evaluation run.
    Essential components of the time evaluation run include but are not limited to the following schema sections:
  • Initialization

  • Provision of Time Data

  • Determination of Planned Working Times

  • Final Processing

  1. Isolate the schema rows not needed for target planning. For example, wage type generation is not needed in most cases. Proceed as follows:
    1. In the schema, prepare a copy of the day processing (the block between initialization and end processing). Put this copy before the original day processing.
    2. Insert the copy into a IF TPLN – ENDIF query.
    3. Delete the unneeded schema rows from this area.
  2. Manually add the PEINS PSOLT switch to table T77S0.
  3. Activate the PEINS PSOLT switch with value X. This ensures that a recalculation of time evaluation is triggered after target planning has finished and the part of the time evaluation schema outside of IF TPLN – ENDIF query is run.

In the standard system, you have the option of not evaluating individual process steps for time evaluation if you launch time evaluation from the target plan. This improves performance during target plan processing. However, in this case, these process steps are also not run once the target plan is finished.

You can use this switch to enable a recalculation of time evaluation once the target plan is finished.

With the IF TPLN function, you can omit individual process steps from evaluation during target plan processing in time evaluation. If you set the switch to value X, time evaluation is automatically called when target planning is finished and the process steps outside the IF TPLN-ENDIF query are run.






CL_GUI_FRONTEND_SERVICES - Frontend Services   RFUMSV00 - Advance Return for Tax on Sales/Purchases  
This documentation is copyright by SAP AG.

Length: 2829 Date: 20240608 Time: 013120     sap01-206 ( 53 ms )