Ansicht
Dokumentation
SIMG_CFMENUOLI0OICH - Define BOM Status
PERFORM Short Reference General Data in Customer MasterThis documentation is copyright by SAP AG.
You can define the possible
The BOM status controls other activities in different areas (for example, engineering, costing, material requirements planning).
1 - BOM active
This BOM can be exploded in material requirements planning, for example, and can be released for the planned order.
2 - BOM inactive
The editing options above are not possible.
Define the possible BOM statuses.
General Material Data Fill RESBD Structure from EBP Component Structure
This documentation is copyright by SAP AG.
Length: 551 Date: 20240607 Time: 154619 sap01-206 ( 19 ms )