SIMG_CFMENUOLPKOPU5 - Define Scheduling Parameters for Planned Orders
RFUMSV00 - Advance Return for Tax on Sales/Purchases Addresses (Business Address Services)This documentation is copyright by SAP AG.
Define the parameters for scheduling planned orders for each plant, order type, and production supervisor.
You define the parameters for scheduling planned orders for each plant, order type, and production supervisor. This comprises the following settings:
- Date adjustment when deadlines are exceeded
- Scheduling control for detailed scheduling
- Reduction
The parameters are described in detail in the following list:
- In Detailed Scheduling, you define the following:
- How production dates are determined
- Whether capacity requirements are generated
- In Adjust Scheduling, you specify the following:
- Whether the takt time-based or rate-based scheduling determines sequencing for planned order dates. If you select this indicator, the dates determined by takt time-based and rate-based scheduling are not overwritten by those determined in lead-time scheduling. The basic dates are also not adjusted. Lead-time scheduling is used to calculate capacity requirements and their dates.
- Whether and how basic dates are adjusted to production dates, for example, when exceeding dates, and what the dates for dependent requirements should be
- In Scheduling Control for Detailed Scheduling, in addition to specifying the control parameters for detailed scheduling, you specify the following:
- Scheduling Type
- You specify the scheduling direction. You can also specify that a scheduling run should only be used to generate capacity requirements.
- Start Date in the Past
- You specify how many days an order may lie in the past before today's scheduling is automatically triggered.
- Display log automatically
- You specify whether the log is automatically displayed after scheduling.
- Latest Staging Date
- You specify how the requirements date for a component is related to the dates of an operation or activity.
- Scheduling with Breaks
- You specify that the break times should be taken into account exactly.
- In Reduction, you specify the following:
- Whether in the order or in the collective order all the operations are reduced or only those on the critical path. Reduction along the critical path is only possible for production orders and planned orders with parallel sequences and for collective orders that contain production orders or planned orders.
- Up to which maximum reduction level the reduction is to take place
- To what percentage the floats before and after production in every reduction level should be reduced.
Define the scheduling parameters for planned orders.