Ansicht
Dokumentation
SIMG_CFMENUOLPSOS34 - Define Alternative Determination for Costing
General Material Data General Material DataThis documentation is copyright by SAP AG.
In this step, you define how alternative determination is to run from the costing point of view.
Product costing with quantity structure determines the required quantity per product from the material BOM.
In the IMG for "Product Cost Controlling" (Product Cost Planning -> Product Costing with Quantity Structure), you first define the quantity structure determination ID per plant.
Then you maintain various control parameters for setting up the quantity structure. One of the parameters for alternative determination in multi-level BOMs is the BOM application.
The quantity structure determination ID ++++ is a fixed setting, which cannot be changed by the user. With this setting, the costing data for a material is checked without any restriction.
The standard setting for the Costing (PC01) application is defined such that the following selection criteria are taken into account:
- Selection ID
- Alternative determination
- Production version
- Indicator for BOM status Released for costing
First complete step Define applications.
Enter an application per quantity structure determination ID and plant.
Note
You can define the alternative determination for costing only for plants for which quantity structure determination has been defined for product costing with quantity structure in the IMG for Controlling
(Define quantity structure determination).
BAL_S_LOG - Application Log: Log header data rdisp/max_wprun_time - Maximum work process run time
This documentation is copyright by SAP AG.
Length: 1809 Date: 20240523 Time: 194332 sap01-206 ( 34 ms )