Ansicht
Dokumentation

SIMG_CFMENUOLSDVOV5 - Assign Schedule Line Categories

SIMG_CFMENUOLSDVOV5 - Assign Schedule Line Categories

General Material Data   BAL_S_LOG - Application Log: Log header data  
This documentation is copyright by SAP AG.
SAP E-Book

Assign schedule line categories to item categories.

In this Customizing activity, you can assign schedule line categories to item categories.

In this configuration activity, you can assign schedule line categories to item categories.

The system allocates the schedule line categories depending on the MRP type that is specified in the material master record for a material. At the same time, you can enter a maximum of nine schedule line categories with which the system default can be manually overwritten during document processing.

  1. Assign the schedule line categories to the item categories depending on the MRP type. In this case, indicate the schedule line categories that are to be proposed during document entry.
  2. If necessary, specify schedule line categories with which the automatically determined schedule line category can be overwritten in the document.





General Data in Customer Master   General Data in Customer Master  
This documentation is copyright by SAP AG.

Length: 988 Date: 20240523 Time: 215637     sap01-206 ( 26 ms )