SIMG_CFMENUOLSDVOV5 - Assign Schedule Line Categories
General Material Data BAL_S_LOG - Application Log: Log header dataThis documentation is copyright by SAP AG.
Assign schedule line categories to item categories.
In this Customizing activity, you can assign schedule line categories to item categories.
In this configuration activity, you can assign schedule line categories to item categories.
The system allocates the schedule line categories depending on the MRP type that is specified in the material master record for a material. At the same time, you can enter a maximum of nine schedule line categories with which the system default can be manually overwritten during document processing.
- Assign the schedule line categories to the item categories depending on the MRP type. In this case, indicate the schedule line categories that are to be proposed during document entry.
- If necessary, specify schedule line categories with which the automatically determined schedule line category can be overwritten in the document.