Ansicht
Dokumentation
SIMG_CFMENUOMP0OPPU - Assign MRP Group to Strategy Group
PERFORM Short Reference Addresses (Business Address Services)This documentation is copyright by SAP AG.
In this step, you assign a strategy group to the
If an MRP group is maintained for a material, the strategies specified in the strategy group are allowed for this material.
In order to find the correct requirements type in demand management and in sales order management, you have to:
- Assign the strategy groups to the MRP groups, and
-
Assign the MRP groups to every material to be planned in the material master record.
-
or
- Enter the strategy group directly in the material master record of the material to be planned
Actions
Maintain the allocation of strategy groups to MRP groups.
General Data in Customer Master BAL Application Log Documentation
This documentation is copyright by SAP AG.
Length: 818 Date: 20240523 Time: 190053 sap01-206 ( 9 ms )