Ansicht
Dokumentation

SIMG_CFMENUOPP1OMIW - Define BOM Explosion Control

SIMG_CFMENUOPP1OMIW - Define BOM Explosion Control

ABAP Short Reference   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.
SAP E-Book

Define the explosion date for the BOM, which is used in the planning run and for calculating dependent requirements.

Plant

In this work step, you define the following plant-specific parameters:

  • Explosion date for BOM
  • Whether the planning run is to create dependent requirements for bulk material in the appropriate plant
  • Whether the planning run is to check whether sales order BOMs exist in the corresponding plant

The explosion date determines which BOM is to be used for explosion in the planning run and, therefore, for the calculation of the dependent requirements. This means, the system selects the BOM that is valid for the explosion date and creates dependent requirements for the components contained in it.

The following possibilities are available for the explosion date:

  • BOM explosion number/order start date
The system checks whether a BOM explosion number exists for the material or the planned order. If yes, the fixed key date recorded in the BOM explosion number is used as the explosion date. If no BOM explosion number has been determined, the order start date of the planned order is used as the explosion date.
  • BOM explosion number/order finish date
The system checks whether a BOM explosion number exists for the material or the planned order. If yes, the fixed key date recorded in the BOM explosion number is used as the explosion date. If no BOM explosion number has been determined, the order finish date of the planned order is used as the explosion date.
  • Only the order start date is valid as explosion date
  • Only the order finish date is valid as explosion date

If you set the Exclude Bulk Material indicator, no dependent requirements are created in the planning run for BOM items that are flagged as bulk materials. This reduces the system load.

If the indicator is not set, the system creates dependent requirements for bulk materials that can only be displayed in the planned order for information purposes but that are not included in the net requirements calculation. They are not planned in the planning run and they are not displayed in the stock and requirements list.

If you set the Procedure with Sales Order BOM/WBS BOM indicator, in the planning run, the system checks whether sales order BOMs or WBS BOMs exist for the materials to be planned. If these BOMs exist, the system explodes these BOMs.

If you set the BOM Explosion Number Make-to-Order/Engineer-to-Order Prod. indicator, in the net calculation, the system checks whether a BOM explosion number exists for the corresponding requirements. If make-to-order or engineer-to-order production is concerned, this BOM explosion number is copied to the receipt elements which are generated subsequently. The BOM explosion number is ignored in make-to-stock production.

MRP Group

In this work step, you define the following parameters, which are specific to the MRP group:

  • Explosion date for the BOM and routing selections
If no indicator is set, the plant settings are copied.
  • Whether the planning run for bulk material should generate dependent requirements for the MRP group concerned
If no indicator is set, the plant settings are copied.

Set the parameters for the plant before setting the parameters for the MRP group.






Addresses (Business Address Services)   Addresses (Business Address Services)  
This documentation is copyright by SAP AG.

Length: 4105 Date: 20240523 Time: 193919     sap01-206 ( 77 ms )