Ansicht
Dokumentation

SIMG_CFMENUOPP1OPPU - Assign MRP Group to Strategy Group

SIMG_CFMENUOPP1OPPU - Assign MRP Group to Strategy Group

SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up   BAL Application Log Documentation  
This documentation is copyright by SAP AG.
SAP E-Book

If an MRP group is maintained for a material, the strategies specified in the strategy group are allowed for this material.

In order to find the correct requirements type in demand management and in sales order management, you have to:

  1. allocate the strategy groups to the MRP groups, and
  2. allocate the MRP groups to the materials to be planned in the material master record.

or

Enter the strategy group directly in the material master record of the material to be planned

Actions

Maintain the allocation of strategy groups to MRP groups.






PERFORM Short Reference   General Material Data  
This documentation is copyright by SAP AG.

Length: 760 Date: 20240523 Time: 190834     sap01-206 ( 14 ms )