Ansicht
Dokumentation
SIMG_CFMENUOPP1OPPU - Assign MRP Group to Strategy Group
SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up BAL Application Log DocumentationThis documentation is copyright by SAP AG.
If an MRP group is maintained for a material, the strategies specified in the strategy group are allowed for this material.
In order to find the correct requirements type in demand management and in sales order management, you have to:
- allocate the strategy groups to the MRP groups, and
-
allocate the MRP groups to the materials to be planned in the material master record.
-
or
- Enter the strategy group directly in the material master record of the material to be planned
Actions
Maintain the allocation of strategy groups to MRP groups.
PERFORM Short Reference General Material Data
This documentation is copyright by SAP AG.
Length: 760 Date: 20240523 Time: 190834 sap01-206 ( 14 ms )