Ansicht
Dokumentation

SIMG_CFMENUORKAKZB2 - Define Calculation Bases Referring to Cost Element and Origin

SIMG_CFMENUORKAKZB2 - Define Calculation Bases Referring to Cost Element and Origin

BAL Application Log Documentation   CPI1466 during Backup  
This documentation is copyright by SAP AG.
SAP E-Book

In this IMG activity you define a calculation base for overhead costing. The calculation base determines to which cost elements overhead is applied together.

For each controlling area, you assign individual cost elements or cost element intervals, or origins or origin intervals, to the calculation bases.

  • For production overhead costs, you can differentiate between fixed and variable costs for the calculation base. In this way, you can charge the fixed and variable portions of the activity price differently for activity types.
  • For material overhead costs, you can differentiate the materials used. If you want to define different material overhead costs for particular raw materials, you can define origin groups and define your own calculation bases for particular origin groups.

You have defined the origin groups:

If you do not specify any origins for a cost element interval, the SAP System considers all the origins in the relevant interval.

To define a calculation base, proceed as follows:

  1. Choose "New entries" to create a new calculation base.
  2. Enter any four-character key you want, and a name for the new calculation base.
  3. Select a row and choose "Detail"
  4. Enter the individual cost elements or cost element groups.
If you have subdivided your cost elements into origins, you can also specify individual origins or origin intervals.
  1. Save your entries.





BAL_S_LOG - Application Log: Log header data   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.

Length: 2009 Date: 20240523 Time: 213502     sap01-206 ( 36 ms )