Ansicht
Dokumentation

SIMG_CFMENUORKEKE4J - Assign Costing Keys to Material Types

SIMG_CFMENUORKEKE4J - Assign Costing Keys to Material Types

General Data in Customer Master   Fill RESBD Structure from EBP Component Structure  
This documentation is copyright by SAP AG.
SAP E-Book

In this step, you assign costing keys to material types for each point of valuation, record type, and plan version (for plan data).

This assignment determines when and for which record type and plan version which product cost estimates are to be read for a specific material type.

You can assign up to three costing keys to each material type for a given "Valid to" date. This means that you can valuate the data using up to three different cost estimates at the same time. The system processes these cost estimates in the order in which the corresponding costing keys are entered on the screen.

PV  RecT   Plan ver.   Mat.type  Valid to    C.key 1 C.key 2 C.key 3

01   F                   MT01   31.12.2002       001     002

02   F                   MT01   31.12.2002       001

Define which costing keys should be used for which material types. If you want to specify costing keys according to another characteristic instead of material types, proceed to the next step.






CL_GUI_FRONTEND_SERVICES - Frontend Services   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.

Length: 1784 Date: 20240523 Time: 194245     sap01-206 ( 30 ms )