Ansicht
Dokumentation
SIMG_CFMENUORKEKE4R - Assign Value Fields
CPI1466 during Backup Fill RESBD Structure from EBP Component StructureThis documentation is copyright by SAP AG.
Here you can assign the components of a
You can divide the cost components into fixed and variable parts before transferring them to CO-PA.
For each cost estimate, you can transfer any number of cost components to the same value field (n:1 relationship). The values from these cost components are then added together in the value field.
If you valuate using multiple material cost estimates simultaneously, this means that
the values of different cost components within the same cost estimate are aggregated
and then entered in one CO-PA value field. However, value fields that already contain data from a previous
cost estimate are not overwritten by a later cost estimate. Consequently, you should assign value fields
in Customizing so that the values of different cost estimates are entered in different sets of value fields.
Assign the components of the cost component structure to the value fields in your operating concern. Remember the you may need to maintain entries in this table for more than one point of valuation.
For detailed information on cost component structures, see Customizing for Product Cost Controlling under "Basic Settings -> Define cost components".
To get to the screen "Assignment: Organizational Units to Cost Component Structure", choose the icon "Next page" from the screen "Define cost components".
General Data in Customer Master Vendor Master (General Section)
This documentation is copyright by SAP AG.
Length: 1969 Date: 20240523 Time: 200417 sap01-206 ( 50 ms )