Ansicht
Dokumentation

SIMG_CFORFBT894PL - Activate Integrated Planning

SIMG_CFORFBT894PL - Activate Integrated Planning

General Data in Customer Master   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.
SAP E-Book

In this activity, you activate integrated planning for a required planning version in G/L Accounting. This enables you to copy planning data from the components Overhead Cost Controlling (CO-OM) or Profitability Analysis (CO-PA) into the required plan version.

The plan version into which you wish to copy planning data must have the same name as the plan version in the original component.

Example

If you wish to copy planning data from the plan version 3 in Overhead Cost Controlling, your plan version in G/L Accounting into which you want to copy the data must also be called 3.

Activate integrated planning for the required plan version.






General Material Data   PERFORM Short Reference  
This documentation is copyright by SAP AG.

Length: 868 Date: 20240524 Time: 010644     sap01-206 ( 34 ms )