Ansicht
Dokumentation
SIMG_CFORFBT894PL - Activate Integrated Planning
General Data in Customer Master SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3upThis documentation is copyright by SAP AG.
In this activity, you activate integrated planning for a required planning version in G/L Accounting. This enables you to copy planning data from the components Overhead Cost Controlling (CO-OM) or Profitability Analysis (CO-PA) into the required plan version.
The plan version into which you wish to copy planning data must have the same name as the plan version in the original component.
Example
If you wish to copy planning data from the plan version 3 in Overhead Cost Controlling, your plan version in G/L Accounting into which you want to copy the data must also be called 3.
Activate integrated planning for the required plan version.
General Material Data PERFORM Short Reference
This documentation is copyright by SAP AG.
Length: 868 Date: 20240524 Time: 010644 sap01-206 ( 34 ms )