Ansicht
Dokumentation

SIMG_ISHMED_RAD_ADT0 - Patient Management with MITRA PACS Broker

SIMG_ISHMED_RAD_ADT0 - Patient Management with MITRA PACS Broker

rdisp/max_wprun_time - Maximum work process run time   CPI1466 during Backup  
This documentation is copyright by SAP AG.
SAP E-Book

Generally all IS-H HCM events can be defined (refer to HCM Communication). In the transfer control, you can set the HCM events OU-related or without a reference.

  • The report RN2_MSI_ADT is to be planned as a periodic batch
  • The MS Windows NT command file msiput.cmd transfers files to an FTP Server.
    If this task is to be performed periodically, it is recommended that you plan the call as a job step in a periodic batchjob.

  • You must plan the report as a periodic batchjob with the transaction sm36.

    In the Selection Parameter HCM - Source File, you specify the complete directory name of the HCM results file. Example: \usr\sap\work\ishcm\pacs\.

    In the selection parameter Logical Name MSI Destination File, you enter the maintained logical file name in the transaction FILE. The supplied logical file name is ISH_MED_RAD_MSI_FILE. The converted MSI files are written into this directory which the PACS Broker reads or are transported by FTP. You must maintain the physical destination path in the transaction FILE
  • File transfer via FTP

    If the files are transferred to the PACS Broker via FTP, a job step must be planned that starts the external NT-Shellscript msiput.cmd with the parameters FTP-destination directory and MSI-file-name extension to the destination drive.

    Call Parameters are

Syntax:,,msiput.cmd [] []

With destpath - FTP destination path, destext - file name extension, Standard is msi.


You must set the following environment variables in the file msiput.cmd:

Name Meaning Sample Value
dest FTP Host BROKER
destuser FTP User Anonymous
destpwd Password
wpath Local Directory C:\MSI\

If you set the environment variable DEBUG to 1, you will receive displays of the defined commands.

Local Directory

Planning the periodic batchjob in five-minute intervals is recommended.






Fill RESBD Structure from EBP Component Structure   ABAP Short Reference  
This documentation is copyright by SAP AG.

Length: 3276 Date: 20240524 Time: 002418     sap01-206 ( 45 ms )