SIMG_OHP3OOCC1 - Define Cost Center of Cost Object
CPI1466 during Backup General Data in Customer MasterThis documentation is copyright by SAP AG.
In this step, you specify the parameters required to determine the cost center of the cost object.
- Under COSTC you specify the evaluation path used to find the cost center of the cost object.
- Under SCOST you specify the cost center of the cost object.
The system first looks for the cost center via the evaluation path. If it finds no cost center, it uses the cost center stored in SCOST.
You can also use the wizard to make these configurations. The wizard guides you through the configuration step-by-step.
If you use the wizard however, you must work through all of the integration settings for cost transfer posting.