Ansicht
Dokumentation

SIMG_OHP3OOFA - Business Event Location Switch

SIMG_OHP3OOFA - Business Event Location Switch

Fill RESBD Structure from EBP Component Structure   Vendor Master (General Section)  
This documentation is copyright by SAP AG.
SAP E-Book

In this step, you activate or deactivate the switch ORT depending on whether or not you want to use business event locations. The value 1 activates it and the value 0 deactivates it.

In the standard system, the switch is active.

You must set this switch if you want to offer events at more than one location.

If you work with business event locations and activate the switch, the user must specify a location in transactions such as planning and creating business events.

If the switch is active, the system carries out a check for location-dependent resources (e.g. rooms) during resource reservation. The system only proposes resources at the location concerned.

For this reason, when you activate this switch, you must always relate location-dependent resources, such as rooms, with the pertinent location.






PERFORM Short Reference   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.

Length: 1002 Date: 20240523 Time: 221229     sap01-206 ( 23 ms )