SIMG_OHT045 - Dynamic Assignment Based on Planned/Actual Overlap

SIMG_OHT045 - Dynamic Assignment Based on Planned/Actual Overlap

PERFORM Short Reference   General Material Data  
This documentation is copyright by SAP AG.
SAP E-Book

In this step, you can assign the employee a einen daily work schedule dynamically on the basis of his or her period work schedule. This new daily work schedule is determined from a group of daily work schedules that show an optimum overlap of the planned specifications with the actual times.

You can assign a daily work schedule dynamically within time evaluation using the Time Management function DYNWS. The assignment is made if the only time pairs for the employee on the day being evaluated come from time events or from the Attendances (2002), Overtime (2005) or Availability (2004) infotypes.
You can use the Type field to determine different groups of daily work schedules to be considered for dynamic assignment for the same personnel subarea grouping for daily work schedules and the same period work schedule. You can set the Type field in time evaluation using operation MODIF.
Unlike dynamic daily work schedule assignment using personnel calculation rule TD30 - that is, based on the first clock-in entry - this form of dynamic assigment cannot be carried out within pair formation.

You want one of the daily work schedules F-11, S-11 or N-11 to be assigned dynamically for employees who work according to the period work schedule M3 (3 shift operation 4W). You want the one where the actual times best match the planned specifications to be assigned. You enter the three daily work schedules for the Type blank and number them in ascending order.

For some of the employees who work according to the period work schedule M3, you only want to allow daily work schedules F-11 and S-11 for dynamic assignment. You enter F-11 and S-11 for the Type 01 and number them in ascending order.

The standard system contains sample entries for the above example.

  1. Decide which personnel subarea groupings for daily work schedules and which period work schedules you want to use this form of dynamic daily work schedule assignment for.
  2. For each period work schedule, specify the group of daily work schedules that should be considered for dynamic assignment.
    1. Only enter values in the Type field if you want to specify different groups of daily work schedules to be considered for dynamic assignment for the period work schedule. Please note that you must set the type within a personnel calculation rule using operation MODIF in order to guarantee correct access.
    2. If you want to make several entries for a personnel subarea grouping for daily work schedules, a period work schedule, and a type, number them in ascending order in the No. field.
    3. Enter the daily work schedules in the Daily WS field. Decide whether you want to take account of daily work schedule variants. If you do, you can either indicate this in the Variant field, or select the Var. ctrl field to specify that you want the variant to be assigned when the work schedule is generated using the Rules for Determining Variant view. For more information, please see the step Define rules for variants.
  3. If you have used the Type field, you create a personnel calculation rule in which you set the type within time evaluation using MODIF S. You can set the type before or during day processing. If you want to set it before day processing, proceed as described in the step Set groupings. If you want to set the type during day processing, create a new personnel calculation rule and add it to your time evaluation schema after function ACTIO. It should be called before function DYNWS.
  4. Add function DYNWS to your time evaluation schema. It should come after the data has been imported but before the error checks.
  • If you want to take account of the Substitutions infotype (2003) or the daily work schedule in the personal work schedule when assigning the daily work schedule dynamically, please see the documentation on function DYNWS.
  • For information on setting the type within a personnel calculation rule, please see the documentation on operation MODIF.





TXBHW - Original Tax Base Amount in Local Currency   TXBHW - Original Tax Base Amount in Local Currency  
This documentation is copyright by SAP AG.

Length: 5165 Date: 20240523 Time: 195358     sap01-206 ( 112 ms )