Ansicht
Dokumentation

SIMG_OHT0506 - Schedule Time Evaluation

SIMG_OHT0506 - Schedule Time Evaluation

ROGBILLS - Synchronize billing plans   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.
SAP E-Book

You schedule a job to perform time evaluation in this step.

You want the recorded time data to be evaluated automatically every night.

You should be familiar with the basics of the SAP Basis system.

  • Choose an appropriate job name, for example time evaluation.
  • If you record time data at a front-end time recording system, choose the start date so that time evaluation is not started until after the time events have been uploaded.
  1. Specify the parameters for starting the time evaluation report.
    It is usually best to make an entry in the Evaluation schema field only.
    You should delete the entry in the field Evaluation up to.
  2. Define a variant.
  3. Define a job for performing time evaluation. The program is called RPTIME00.
  4. Enter the name of the variant you have created in the Variant field.
  • A job scheduled in the test system is not transported to the production system: you have to schedule it again in the production system. Note that the required variant must also be created in the production system.
  • You do not necessarily have to link the start of time evaluation with the job for uploading time events.





Vendor Master (General Section)   CL_GUI_FRONTEND_SERVICES - Frontend Services  
This documentation is copyright by SAP AG.

Length: 1715 Date: 20240523 Time: 203712     sap01-206 ( 25 ms )