Ansicht
Dokumentation
SIMG_OHT0612 - Generate Breaks for Overtime on a Public Holiday
CPI1466 during Backup BAL Application Log DocumentationThis documentation is copyright by SAP AG.
In this step, you determine whether the breaks specified in the daily work schedule should be taken into account for attendances on a public holiday.
An employee is at work on a day of day type 1. The breaks specified in the employee's current daily work schedule should count for the employee's attendance times, from which overtime on a public holiday is generated.
A planned pair based on the daily work schedule must be generated on the public holiday.
There is further information on this subject in Check for day with errors
In the standard SAP system, breaks are not deducted from attendance times for determining overtime on public holidays.
- Decide upon the employee groupings for time recording for which the breaks based on the daily work schedule should be taken into account on days of day type 1.
- Enter "B" in the Rec.abs. field for these groupings under the appropriate time type determination group and the time identifiers "04" and "05".
- Insert function COPY with TOB0 as the first parameter directly before overtime calculation.
BAL Application Log Documentation Addresses (Business Address Services)
This documentation is copyright by SAP AG.
Length: 1564 Date: 20240523 Time: 201716 sap01-206 ( 31 ms )