Ansicht
Dokumentation

SIMG_OLPR_ABRECHOPTR - Define Strategies for Determining Settlement Rules

SIMG_OLPR_ABRECHOPTR - Define Strategies for Determining Settlement Rules

General Material Data   rdisp/max_wprun_time - Maximum work process run time  
This documentation is copyright by SAP AG.
SAP E-Book

In this step you define a strategy to determine the settlement rule in the network.

You enter the sequence in which the settlement rule is determined for each strategy:

  • Copy the settlement rule from the WBS element
  • Copy the settlement rule from the project definition
  • Generate a settlement rule to the WBS element
  • Generate a settlement rule by default (predefined by the system)
  • Maintain a settlement rule manually

You must define the strategy for the settlement rule in the parameters for the network type.

If you do not define a key for the determining the settlement rule, the system first attempts to generate a settlement rule by the default rule. If this is not possible, you must maintain the settlement rule manually in the network.

  1. Define a strategy, if necessary.
  2. Define the strategy in the parameters for the network type.






ABAP Short Reference   Vendor Master (General Section)  
This documentation is copyright by SAP AG.

Length: 1132 Date: 20240523 Time: 211815     sap01-206 ( 20 ms )