Ansicht
Dokumentation

SIMG_OLPR_CJBBS2 - Maintain Report Assignment from the Structure Overview

SIMG_OLPR_CJBBS2 - Maintain Report Assignment from the Structure Overview

ABAP Short Reference   General Data in Customer Master  
This documentation is copyright by SAP AG.
SAP E-Book

In this activity, you stipulate which hierarchy reports you can access from the structure overview or the individual overviews using the report/report interface.

  1. Specify the application class KP for projects.
  2. Specify a controlling area. Regardless of what you enter, the entries are maintained by report, not by controlling area.
  3. Create report type project report.
  4. Specify the technical name of the report you want to add as the receiver report.

From the structure overview and the individual overviews, you can only access reports from the application KP with report category drilldown and report type project report.

The settings made here must be transported manually. Create a transport request with table TRSTI. Maintain the following fields:






General Material Data   General Data in Customer Master  
This documentation is copyright by SAP AG.

Length: 1176 Date: 20240523 Time: 185916     sap01-206 ( 22 ms )
STOOL TR
SAPPL KP