Ansicht
Dokumentation

SIMG_ORKKOKK6 - Define Date Control

SIMG_ORKKOKK6 - Define Date Control

Addresses (Business Address Services)   SUBST_MERGE_LIST - merge external lists to one complete list with #if... logic for R3up  
This documentation is copyright by SAP AG.
SAP E-Book

In costing, date control IDs control the dates on which the quantity structure and the value structure are created. The dates determine the following parameters:

  • The validity period of the cost estimate

  • The date on which the quantity structure is valuated (valuation date)

Date control determines which dates are proposed or displayed when a cost estimate is created, and whether these dates can be changed by the user.

If you want to calculate variances with reference to the cost estimate, make sure that the cost estimate is valid in the periods in which you will calculate the variances.

If you intend to valuate scrap or work in process with the results of the standard cost estimate, you should make sure that the cost estimate is valid in the periods in which you will calculate variances or work in process.

The standard system contains predefined date control IDs. You can use these without making any changes.

Check whether the existing date control IDs meet your requirements. If this is not the case, create a new one.

  1. Choose New entries.
  2. Enter an alphanumerical key and a name for the date control ID.
  3. Specify which dates should be proposed by the system and whether the user can change these default dates.
  4. Save your entries.





General Material Data   RFUMSV00 - Advance Return for Tax on Sales/Purchases  
This documentation is copyright by SAP AG.

Length: 3141 Date: 20240523 Time: 221010     sap01-206 ( 38 ms )