Ansicht
Dokumentation
SIMG_ORKK_SEIB_KA - Define Costing Types
PERFORM Short Reference General Material DataThis documentation is copyright by SAP AG.
In this step you specify the technical attributes for costing production lots.
The costing type controls the following:
- Which basis is used for allocating overhead. You enter a
cost component view for this purpose. The system generates an
itemization for each cost component view, listing the items in the cost estimate.
- Example
-
If there are semifinished products in the cost estimate, and the costs of these products include the
cost of goods manufactured, sales and administration costs, and so on, you can calculate the material
overhead based on the cost of goods manufactured for the semifinished product by specifying cost component
view "01" (cost of goods manufactured) as the overhead calculation base. This ensures that only the cost of goods manufactured is used to calculate overhead, and not the sales and administration costs and so on.
- Which valuation view should be costed
- Whether overhead for semifinished products that are subject to individual requirements and are used in the finished product is allocated based on the costing sheet specified in the production lot
If you want to define your own cost component views, carry out the following step:
If you use the multiple valuation functions, do the following:
- In Customizing for General Controlling, check the settings for parallel valuation.
- In Customizing for Enterprise Controlling, check the assignment of the operational valuation in the
currency and valuation profile for the controlling area.
Maintain Controlling Area Settings
The standard system contains costing type 40 (SEIBAN costing).
- Choose New Entries.
- Enter an alphanumeric key and a description for the new costing type. Numeric keys will be rejected since this type of key is reserved for the SAP standard settings.
- Enter a calculation base.
- Specify whether the costing sheet specified in the production lot should be used.
- Specify which valuation view you want to cost.
- Save the costing type.
For more information on SEIBAN, refer to the SAP Library under Production Lot Planning and Product Cost Planning.
rdisp/max_wprun_time - Maximum work process run time PERFORM Short Reference
This documentation is copyright by SAP AG.
Length: 3487 Date: 20240523 Time: 220048 sap01-206 ( 53 ms )